top of page

U.K. ESG Watch: Transparency on Construction sector in the U.K.


ICSD U.K. would like to share some best practices in the U.K. construction sector:


From the construction sites, citizens can see:

  1. Regular Community Newsletter - to report the recent completed & ongoing activities and the works in the next 2 months.

  2. Disclosure of "Non-Hazardous Soft Strip Waste" management.

  3. Monthly disclosure of "Noise, Dust and Vibration Monitoring Data Summary".

  4. Registered with "Considerate Constructors Scheme" and the performance is regularly monitored and certified.


What's more? Community friendly facilities like "Bike Repair Stations" and "Pet Hydration Stations" are set up outside the construction sites


Attached please see the photos of the above.


Transparency is always the best ESG practice!



website-logo.png
國際可持續發展協進會
CERTIFIED ESG PLANNER
CEP-transparent background_edited.png

香港中環皇后大道中70號, 卡佛大廈1104室  |  電話: +852 8209 8210

© 2023 ICSD Global | All Rights Reserved

  • Facebook
  • LinkedIn
  • Youtube
bottom of page